- p2VIBRATION MONITORING - THE PROJECT BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE AT A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p2Sheet page 2 is a continuation of general notes and includes the Summary of Quantities table on the right.
Every crop it was read in — the drawing beside what the model took off it
Page 2
crop
p02_r01 title blockNotes
- SHOP DRAWINGSdocumentSUBMIT SHOP DRAWINGS WITH DEPENDENT INFORMATION AS A SET. SHOP DRAWINGS FOR BEAMS, METAL DECK, FORMS AND STEEL DIAPHRAGMS WILL NOT BE REVIEWED UNTIL ALL HAVE BEEN RECEIVED
- CERTIFICATION CARDcertificateWELDERS CERTIFICATION CARD ISSUED BY THE OFFICE OF MATERIALS AND TESTING
35 CY 207-020335 CY 207-0203295 CY 211-0200295 CY 211-0200811 SY 500-0100811 SY 500-01002720 LB 520-11252540 LB 520-1125+2 more
crop
p02_r01Notes
- Summary of Quantities×1rectangulartext/table
35 CY 207-0203 Left Bridge35 CY 207-0203 Right Bridge295 CY 211-0200 Left Bridge295 CY 211-0200 Right Bridge811 SY 500-0100 Left Bridge811 SY 500-0100 Right Bridge2720 LF 520-1125 Left Bridge2540 LF 520-1125 Right Bridge