Matched toDiaphragmbridge.superstructure.secondary_member_system.diaphragmon “Diaphragm”
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| LengthL | m/mm | 82'-0" ft | p5 · p05_r01 deck plan |
| Cross-sectional AreaA | m2/mm2 | no reading by that name | |
| Instance CountN | count | no reading by that name | |
| Material TypeMAT | — | no reading by that name | |
| MassMoptional | kg/t | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
How the sheets named it
Every dimension read for it15
- 82'-0" ftSPAN 2 TOTAL LENGTHnot attributedp5 · p05_r01 deck plan
- 16'-4 1/2" ftDECK SEGMENT LENGTHnot attributedp5 · p05_r01 deck plan
- 16'-4 1/2" ftDECK SEGMENT LENGTHnot attributedp5 · p05_r01 deck plan
- 16'-4 1/2" ftDECK SEGMENT LENGTHnot attributedp5 · p05_r01 deck plan
- 16'-4 1/2" ftDECK SEGMENT LENGTHnot attributedp5 · p05_r01 deck plan
- 16'-4 1/2" ftDECK SEGMENT LENGTHnot attributedp5 · p05_r01 deck plan
- 22'-0" ftGUTTER TO GUTTERnot attributedp5 · p05_r01 deck plan
- 43'-0" ftOUT TO OUTnot attributedp5 · p05_r01 deck plan
- 1'-9 1/2" ftSPRING LINEnot attributedp5 · p05_r01 deck plan
- 34'-0" ftOverall lengthnot attributedp8 · p08_r01
- 3'-0" ftLeft endwall widthp8 · p08_r01
- 6'-8" ftTop right offsetnot attributedp8 · p08_r01
- 1'-1" ftRightmost clearancenot attributedp8 · p08_r01
- 1'-8" ftLeft offsetnot attributedp8 · p08_r01
- 1'-6" ftEndwall offsetp8 · p08_r01
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE AT A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
- p63'-0" ENDWALL OUTSIDE EXTERIOR BEAM, TYP.
- p6"8" FILLET, TYP.
- p6"10" CONCRETE DIAPHRAGM, TYP.
- p6END POST
- p6FENCE POST SPACING
- p6PGL WESTBOUND
- p6PGL EASTBOUND
- p8FENCE NOTES:
- p81. FENCE SHALL BE 9 GAGE CHAIN LINK ZINC COATED TWO INCH SECURITY FENCE.
- p82. CAST 4" DIA. GALVANIZED SLEEVE IN THE PARAPET. ALLOW NON-SHRINK, NON-METALLIC GROUT TO CURE FOR THREE DAYS BEFORE FENCE FABRIC IS INSTALLED.
- p83. APPLY GALVANIZING REPAIR COMPONENT, IN ACCORDANCE WITH GEORGIA DOT SPECIFICATIONS SECTIONS 645, TO ENDS OF 4" DIA. GALVANIZED SLEEVES.
- p81. FENCE SHALL BE 9 GAUGE CHAIN LINK ZINC COATED TWO INCH SECURITY FENCE.
- p83. APPLY GALVANIZING REPAIR COMPOUND, IN ACCORDANCE WITH GEORGIA DOT SPECIFICATIONS SECTIONS 645, TO ENDS OF 4" DIA. GALVANIZED SLEEVES.
- p84. PROVIDE EXPANSION SLEEVE FOR ALL RAILS TO MATCH SUPERSTRUCTURE JOINTS.
- p85. FASTEN FABRIC TO POSTS AT INTERVALS NOT GREATER THAN 14".
- p86. SPACE POSTS AT A MINIMUM OF 7'-0" AND A MAXIMUM OF 10'-0". PLACE POSTS 1'-0" MINIMUM FROM JOINTS IN BARRIER. SEE DECK PLAN FOR POST SPACING.
- p87. FOR FURTHER DETAILS, SEE GEORGIA DOT SPECIFICATIONS SECTIONS 643 AND 894.
- p12PREFORMED FOAM JOINT FILLER SHALL BE IN ACCORDANCE WITH SUB-SECTION 833.2.10 OF THE GEORGIA DOT SPECIFICATIONS.
Every crop it was read in — the drawing beside what the model took off it
Page 2
p02_r01 title blockNotes
- STEEL DIAPHRAGMSdiaphragmsteelSTEEL DIAPHRAGMS
35 CY 207-020335 CY 207-0203295 CY 211-0200295 CY 211-0200811 SY 500-0100811 SY 500-01002720 LB 520-11252540 LB 520-1125+2 more
Page 4
p04_r01Plan
- 10" CONCRETE DIAPHRAGM, TYP.×1diaphragmconcrete
55'-0" ft SPAN I4'-6" ft END POST18'-4" ft FENCE POST SPACING40'-0" ft GUTTER TO GUTTER55'-0" ft OUT TO OUT1'-0" ft END POST
Page 5
p05_r01 deck planPlan
- 10" CONCRETE DIAPHRAGM, TYP.×1rectangular
82'-0" ft SPAN 2 TOTAL LENGTH16'-4 1/2" ft DECK SEGMENT LENGTH16'-4 1/2" ft DECK SEGMENT LENGTH16'-4 1/2" ft DECK SEGMENT LENGTH16'-4 1/2" ft DECK SEGMENT LENGTH16'-4 1/2" ft DECK SEGMENT LENGTH22'-0" ft GUTTER TO GUTTER43'-0" ft OUT TO OUT+1 more
p05_r01Plan
- 10" CONCRETE DIAPHRAGM, TYP.10" CONCRETE DIAPHRAGM, TYP.×1rectangularconcretetypical
82'-0" ft 82'-0"16'-4 1/2" ft 16'-4 1/2"9'-6" ft 9'-6"3'-0" ft 3'-0"2'-0" MIN. LAP ft 2'-0" MIN. LAP22'-0" ft 22'-0"
Page 6
p06_r01Plan
- ENDWALLENDWALL×1rectangularEndwall outside exterior beam, typical.
- 10" Concrete Diaphragm10" CONCRETE DIAPHRAGM, TYP.×1diaphragmconcrete
55'-0" ft-in SPAN 36'-6" ft-in FENCE POST SPACING - SEG 19'-6" ft-in FENCE POST SPACING - SEG 29'-6" ft-in FENCE POST SPACING - SEG 39'-6" ft-in FENCE POST SPACING - SEG 417'-2 3/4" ft-in SPAN LENGTH A17'-5 1/4" ft-in SPAN LENGTH B52'-2 1/16" ft-in SPAN LENGTH C+2 more
Page 8
p08_r01 for further details see georgia dot specSection
- ENDWALL×1rectangularreinforced concrete3'-0" ENDWALL
- ENDWALL×1rectangularreinforced concrete1'-6" ENDWALL
34'-0" 34'-0"6'-8" 6'-8"3'-0" ENDWALL 3'-0" ENDWALL1'-6" ENDWALL 1'-6" ENDWALL2% 2% slope
p08_r01Section
- Endwall×1rectangularreinforced concrete
34'-0" ft Overall length3'-0" ft Left endwall width6'-8" ft Top right offset1'-1" ft Rightmost clearance1'-8" ft Left offset1'-6" ft Endwall offset2 7/8" in Pull post diameter4" in Pipe sleeve diameter+1 more
Page 12
p12_r01 in accordance with sub section 833 2 10Detail
- ENDWALL×1irregular
1" in BEARING PAD THICKNESS1/2" in DOWEL DIAMETER
p12_r01Detail
- ENDWALL×1rectangularunknown
1 in DOWEL DIAMETER