Matched toCrossing Alignmentbridge.alignment_system.crossing_alignmenton “TOP OF RAIL”
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| Skew AngleTHETA | deg | no reading by that name | |
| ChainageCHoptional | m | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
Notes on the sheets that carry it
- p3EXISTING TRACK ALIGNMENT
- p3SURVEY DATED SEPTEMBER 18, 2024
Every crop it was read in — the drawing beside what the model took off it
Page 3
p03_r01Plan
- TABLE - SURVEYED TOP OF RAIL ELEVATIONS×1table
302+00.00 station STA. 302+00.002.5 LT OFFSETI60. ELEV302+50.00 station STA. 302+50.00303+00.00 station STA. 303+00.00303+50.00 station STA. 303+50.00304+00.00 station STA. 304+00.00304+50.00 station STA. 304+50.00