⚠ No class in the bridge ontology fits this itemAdd a class
The ontology would need a welding process or consumable material class.
Notes on the sheets that carry it
- p2VIBRATION MONITORING - THE PROJECT BUREAU OF THE GEORGIA DOT OFFICE OF MATERIALS AND TESTING AT GEOTECHNICAL SUBMITTALS@DOT.GA.GOV TWO WEEKS PRIOR TO DRIVING PILES. SEE SPECIAL PROVISION 154 - CONSTRUCTION VIBRATION MONITORING.
- p2PILE LENGTHS - ERRATIC PILE LENGTHS CAN BE EXPECTED.
- p2PILE DRIVING - SHOULD PILES FAIL TO OBTAIN DRIVING RESISTANCE AFTER ACHIEVING THE TIP ELEVATIONS SHOWN, ALLOW PILES TO FREEZE AT A MINIMUM OF 24 HOURS AND RESTRIKE WITH A WARM HAMMER.
Every crop it was read in — the drawing beside what the model took off it
Page 2
crop
p02_r01 title blockNotes
- WELDINGweldingALL WELDING ON GEORGIA DOT PROJECTS SHALL BE PERFORMED BY GDOT CERTIFIED WELDERS
35 CY 207-020335 CY 207-0203295 CY 211-0200295 CY 211-0200811 SY 500-0100811 SY 500-01002720 LB 520-11252540 LB 520-1125+2 more