⚠ No class in the bridge ontology fits this itemAdd a class
The ontology would need a bridge limits reference-boundary class.
How the sheets named it
Notes on the sheets that carry it
- p3SURVEY DATED SEPTEMBER 18, 2024
- p3℄ FUTURE ACCESS ROAD
- p3℄ FUTURE TRACK
- p3℄ CENTRAL OF GEORGIA RAILROAD COMPANY EXISTING TRACK
- p3LIMITS OF LEFT BRIDGE
- p3BEGIN BRIDGE STA. 17+23.00
- p3END BRIDGE STA. 19+15.00
- p3LIMITS OF RIGHT BRIDGE
- p3TO US 25/SR 121
- p3TO GA HIGHWAY 23
- p3TO PERKINS
- p3TO MILLEN
- p3AHEAD
Every crop it was read in — the drawing beside what the model took off it
Page 3
p03_r01 elevations on existing central of gPlan
- bridge limitsLEFT BRIDGE×1rectangular dashed outlineDashed outline labeled as limits of left bridge.
- bridge limitsRIGHT BRIDGE×1rectangular dashed outlineDashed outline labeled as limits of right bridge.
81°-20’-05.0” bridge skew angleN 83°-43’-21.7” E bearingSTA. 18+16.85 stationSTA. 303+80.83 stationSTA. 17+23.00 begin bridge stationSTA. 19+15.00 end bridge station302+00 station302+50 station+38 more
p03_r01Plan
- Bridge limitsLEFT BRIDGE×1rectangular dashed outlineShown as limits of left bridge.
- Bridge limitsRIGHT BRIDGE×1rectangular dashed outlineShown as limits of right bridge.
18+16.85 SR 21 station303+80.83 Central of Georgia Railroad Company station17+23.00 Begin bridge station19+15.00 End bridge station81°-20'-05.0” Typical angle81°-20'-05.0” AngleN 83°-43'-21.7” E Bearing302+00 Railroad station+17 more