Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedBoth plan readings identify temporary shoring only by the note “TEMPORARY SHORING AS NECESSARY, TYP.” Neither crop provides a dimension assigned to the temporary shoring. | not found | |
| HeightHwants m/mm | not establishedNo temporary-shoring height or vertical extent is stated. The clearance dimensions shown apply to the bridge, railroad, or clearance areas, not to the shoring. | not found | |
| Surface AreaA_surfacewants m2 | not establishedTemporary shoring geometry, length, height, and any other dimensions from which its surface area could be calculated are not provided. | not found | |
| Material TypeMAT | not establishedThe temporary-shoring callout specifies that shoring is necessary and typical, but does not state a material type. | not found |
Worked out by openai/gpt-5.6-terra-pro from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p1FRONT FACE OF WALL 1
- p1FRONT FACE OF WALL 2
- p1ℂ FUTURE ACCESS ROAD
- p1ℂ FUTURE TRACK
- p1ℂ CENTRAL OF GEORGIA RAILROAD COMPANY EXISTING TRACK
- p112'-1" MIN.
- p1POINT OF MIN. VERT. CLEARANCE
- p1FUTURE POINT OF MIN. VERT. CLEARANCE
- p1AHEAD
- p1TO PERKINS
- p1TO US 25/SR 121
- p1PGL WESTBOUND
- p1PGL EASTBOUND
- p1ℂ BENT 2L / ℂ BENT 2R
- p1ℂ BENT 3L / ℂ BENT 3R
- p1B.F.P.R. BENT 1L / 1R / 4L / 4R
- p181°-20'-05.0", TYP.
- p1STA. 18+16.85, ℂ SR 21 = STA. 303+80.83, ℂ CENTRAL OF GEORGIA RAILROAD COMPANY
- p1BEGIN BRIDGE STA. 17+23.00
- p1STA. 17+29.07
- p1RRMP D-0080.54
- p1ℂ SR 21
- p1N 83°-43'-21.7" E
- p1PT#3
- p1END BRIDGE STA. 19+15.00
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1TO BE REMOVED
- p1TO GA HIGHWAY 23
- p1RR R/W
- p1TO MILLEN
- p1MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN
- p1CHAIN LINK WIRE FENCE, TYP.
- p1TOTAL LENGTH OF BRIDGE = 192'-0" ***
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r01 planPlan
- Temporary shoringunspecifiedunspecifiedNoted 'as necessary, typ.' near end bridge station
192'-0" ft-in Total length of bridge55'-0" ft-in Span 1 length82'-0" ft-in Span 2 length55'-0" ft-in Span 3 length40'-0" ft-in Gutter to gutter width43'-7" ft-in Out to out width1'-9 1/2" ft-in Deck edge to point of min vert clearance6'-0" ft-in Offset dimension+21 more
p01_r01Plan
- Temporary shoring×1linearShown near the railroad at the right side.
12'-1" MIN. Minimum dimension74'-7 15/16" DimensionN 2°-23'-16.71" E Bearing / direction75'-10 15/16" Dimension1'-9½" Minimum vertical clearance offset6'-0" Dimension40'-0" Gutter-to-gutter width43'-7" Gutter-to-out width+23 more