Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
4 not established
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | not establishedTemporary shoring is identified only by the note “TEMPORARY SHORING AS NECESSARY, TYP.” No dimension is assigned to the temporary shoring extent. The stated bridge, track, clearance, and span dimensions do not establish the shoring length. | not found | |
| HeightHwants m/mm | not establishedThe plan identifies temporary shoring but provides no shoring height, elevation, or vertical dimension applicable to it. | not found | |
| Surface AreaA_surfacewants m2 | not establishedNo temporary-shoring length and height are stated or derivable; therefore its surface area cannot be calculated. | not found | |
| Material TypeMAT | not establishedThe temporary-shoring callout does not state a material type. | not found |
Worked out by openai/gpt-5.6-terra from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p1POINT OF MIN. VERT. CLEARANCE
- p1FUTURE POINT OF MIN. VERT. CLEARANCE
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1TO BE REMOVED
- p1MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN
- p1CHAIN LINK WIRE FENCE, TYP.
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r01 planPlan
- temporary shoringlinearShown along the railroad crossing area; identified as typical/as necessary.
12'-1" minimum dimension74'-7 15/16" dimensionN. 2'-23'-16'-7" area dimension75'-10 15/16" dimension1'-9 1/2" minimum vertical clearance40'-0" gutter to gutter43'-7" gutter to gutter6'-0" spacing+29 more