| The class asks for | Value | How | From |
|---|---|---|---|
| Skew AngleTHETAwants deg | not establishedThe construction clearance diagram identifies the TOP OF HIGH RAIL reference line but gives no skew angle. | not found | |
| ChainageCHwants m | not establishedThe construction clearance diagram gives no chainage for the TOP OF HIGH RAIL. | not found |
Worked out by openai/gpt-5.6-terra from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
TOP OF HIGH RAIL
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r05 construction clearance diagramDetail
- top of high railTOP OF HIGH RAIL×1horizontal lineBottom reference line of clearance diagram.
22'-0" overall vertical clearance13'-0" horizontal clearance from track centerline to left side13'-0" horizontal clearance from track centerline to right side