Drawing → BOQ
bridge ontologyBridge Asset › Approach and Earthwork System

Approach Embankment

bridge.approach_earthwork_system.embankment
publishedEdit

Definition

Engineered fill forming the road approach to the bridge.

Class kind
component
Abstract
no
Depth
2
Origin
reference source
Ontology
engineering-reference-book.bridge v1.0.0
Aliases
Approach Fill, Road Embankment
Abbreviations
Last changed
7/27/2026, 2:50:05 PM

Identification

Positive labels
Approach Embankment, Approach Fill, Road Embankment
Negative labels
Visual features
sloped earth profile; layered fill hatch
Min identity clues
2

Evidence

Preferred views
plan, profile, cross_section
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (4)

NameSymbolUnitRequired
LengthLm/mmrequired
Cross-sectional AreaAm2/mm2required
Material TypeMATrequired
SlopeSLOPEratio/percentoptional

Relationships (2)

BOQ items (1)

Item codeFormulaResultUnit
bridge.earthwork.embankment.volumeA_avg * Lvolumem3

Validation

Blocking if missing
yes
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_elevation_and_section_when_applicable
  • earthwork_cross_sections_must_be_station_matched

Provenance

Basis
engineering_reference
Project values included
no

Children (0)

None — this is a leaf class and can be deleted.