Drawing → BOQ
bridge ontologyBridge Asset › Approach and Earthwork System

Foundation Excavation

bridge.approach_earthwork_system.excavation
publishedEdit

Definition

Removal of ground to construct bridge foundations or substructure.

Class kind
component
Abstract
no
Depth
2
Origin
reference source
Ontology
engineering-reference-book.bridge v1.0.0
Aliases
Structural Excavation, Bridge Excavation
Abbreviations
Last changed
7/27/2026, 2:50:05 PM

Identification

Positive labels
Foundation Excavation, Structural Excavation, Bridge Excavation
Negative labels
Visual features
excavation limits around foundation
Min identity clues
2

Evidence

Preferred views
plan, section, method_statement
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (5)

NameSymbolUnitRequired
LengthLm/mmrequired
WidthWm/mmrequired
Excavation DepthD_excm/mmrequired
Working SpaceWSm/mmrequired
Instance CountNcountrequired

Relationships (0)

None declared.

BOQ items (1)

Item codeFormulaResultUnit
bridge.earthwork.foundation_excavation.volume(L + 2 * WS) * (W + 2 * WS) * D_exc * Nvolumem3

Validation

Blocking if missing
yes
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_elevation_and_section_when_applicable
  • working_space_must_come_from_approved_project_rule

Provenance

Basis
engineering_reference
Project values included
no
regional_terminology
no page list

Children (0)

None — this is a leaf class and can be deleted.