Drawing → BOQ
bridge ontologyBridge Asset › Approach and Earthwork System

Retaining Wall

bridge.approach_earthwork_system.retaining_wall
publishedEdit

Definition

Independent wall retaining soil near the bridge or approach.

Class kind
component
Abstract
no
Depth
2
Origin
reference source
Ontology
engineering-reference-book.bridge v1.0.0
Aliases
Cantilever Retaining Wall, Gravity Retaining Wall
Abbreviations
Last changed
7/27/2026, 2:50:05 PM

Identification

Positive labels
Retaining Wall, Cantilever Retaining Wall, Gravity Retaining Wall
Negative labels
Visual features
stem and base slab; retained soil hatch
Min identity clues
2

Evidence

Preferred views
plan, elevation, section, detail
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (7)

NameSymbolUnitRequired
LengthLm/mmrequired
Wall ThicknessT_wallm/mmrequired
HeightHm/mmrequired
Base WidthW_basem/mmrequired
ThicknessTm/mmrequired
Instance CountNcountrequired
Concrete Gradefckrequired

Relationships (0)

None declared.

BOQ items (1)

Item codeFormulaResultUnit
bridge.concrete.retaining_wall.volume(V_stem + V_base + V_counterforts) * Nvolumem3

Facets

structural_type
gravity, cantilever, counterfort, sheet_pile

Validation

Blocking if missing
yes
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_elevation_and_section_when_applicable

Provenance

Basis
engineering_reference
Project values included
no

Children (0)

None — this is a leaf class and can be deleted.