Drawing → BOQ
bridge ontologyBridge Asset

Construction and Temporary Works

bridge.construction_system
publishedEdit

Definition

Temporary or process-dependent works needed to construct the permanent bridge.

Class kind
system
Abstract
yes
Depth
1
Origin
reference source
Ontology
engineering-reference-book.bridge v1.0.0
Aliases
Abbreviations
Last changed
7/27/2026, 2:50:05 PM

Identification

Positive labels
Construction and Temporary Works
Negative labels
Visual features
Min identity clues
0

Evidence

Preferred views
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (0)

None — this class carries no measured quantities.

Relationships (0)

None declared.

BOQ items (0)

None — no quantity is derived from this class directly.

Validation

Blocking if missing
no
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_elevation_and_section_when_applicable

Provenance

Basis
engineering_reference
Project values included
no

Children (5)