← bridge ontologyBridge Asset › Bridge Foundation System
Blinding Concrete
bridge.foundation_system.blinding_concretepublishedEdit
Definition
Lean concrete leveling layer beneath a structural foundation.
- Class kind
- component
- Abstract
- no
- Depth
- 2
- Origin
- reference source
- Ontology
- engineering-reference-book.bridge v1.0.0
- Aliases
- PCC Levelling Course, Levelling Concrete
- Abbreviations
- —
- Last changed
- 7/27/2026, 2:50:05 PM
Identification
- Positive labels
- Blinding Concrete, PCC Levelling Course, Levelling Concrete
- Negative labels
- —
- Visual features
- thin concrete layer under footing or cap
- Min identity clues
- 2
Evidence
- Preferred views
- section, detail
- Evidence types
- view, detail, schedule, note, dimension, level, section_callout
- Source trace required
- yes
Measurements (5)
| Name | Symbol | Unit | Required |
|---|---|---|---|
| Length | L | m/mm | required |
| Width | W | m/mm | required |
| Thickness | T | m/mm | required |
| Instance Count | N | count | required |
| Concrete Grade | fck | — | required |
Relationships (1)
- supports
bridge.foundation_system
BOQ items (1)
| Item code | Formula | Result | Unit |
|---|---|---|---|
bridge.concrete.blinding.volume | L * W * T * N | volume | m3 |
Validation
- Blocking if missing
- yes
- Human review allowed
- yes
no_evidence_no_numberretain_document_page_bbox_and_evidence_iddo_not_mix_drawing_revisionsdo_not_average_conflicting_valuesprefer_explicit_labels_over_shape_onlymatch_plan_elevation_and_section_when_applicable
Provenance
- Basis
- engineering_reference
- Project values included
- no
Children (0)
None — this is a leaf class and can be deleted.