Drawing → BOQ
bridge ontologyBridge Asset › Bridge Foundation System › Deep Foundation

Pile Cap

bridge.foundation_system.deep_foundation.pile_cap
publishedEdit

Definition

Reinforced-concrete block distributing substructure load to a pile group.

Class kind
component
Abstract
no
Depth
3
Origin
reference source
Ontology
engineering-reference-book.bridge v1.0.0
Aliases
Pilecap
Abbreviations
Last changed
7/27/2026, 2:50:05 PM

Identification

Positive labels
Pile Cap, Pilecap
Negative labels
Visual features
thick slab above pile symbols; pile cap outline in plan
Min identity clues
2

Evidence

Preferred views
plan, section, elevation, foundation_schedule
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (6)

NameSymbolUnitRequired
LengthLm/mmrequired
WidthWm/mmrequired
ThicknessTm/mmrequired
Instance CountNcountrequired
Concrete Gradefckrequired
Top LevelTOLmrequired

Relationships (2)

BOQ items (1)

Item codeFormulaResultUnit
bridge.concrete.pile_cap.volumeL * W * T * Nvolumem3

Validation

Blocking if missing
yes
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_elevation_and_section_when_applicable
  • pile_cap_requires_pile_evidence_or_explicit_label
  • do_not_confuse_with_spread_footing

Provenance

Basis
drawing_observed
Project values included
no
vadhavan_port_rob_viaduct_gad
pages 2, 8, 9

Children (0)

None — this is a leaf class and can be deleted.