Drawing → BOQ
highway ontologyHighway Asset › Earthwork System

Embankment Fill

highway.earthwork_system.embankment
draftEdit

Definition

Compacted fill raising the formation above existing ground.

Class kind
component
Abstract
no
Depth
2
Origin
reference source
Ontology
engineering-reference-book.highway v0.1.0
Aliases
Fill, Bank, Embankment
Abbreviations
Last changed
7/27/2026, 2:50:06 PM

Identification

Positive labels
Embankment Fill, Fill, Bank, Embankment
Negative labels
Visual features
formation line above ground line; side slopes with 1:n callouts
Min identity clues
2

Evidence

Preferred views
cross_section, longitudinal_section, earthwork_schedule
Evidence types
view, detail, schedule, note, dimension, level, section_callout
Source trace required
yes

Measurements (4)

NameSymbolUnitRequired
Fill AreaA_fillm2required
LengthLmrequired
HeightHmoptional
Side Slopesloperatiooptional

Relationships (2)

BOQ items (1)

Item codeFormulaResultUnit
highway.earthwork.embankment.volumeA_fill * Lvolumem3

Facets

material
granular_fill, selected_soil, fly_ash, rock_fill

Validation

Blocking if missing
yes
Human review allowed
yes
  • no_evidence_no_number
  • retain_document_page_bbox_and_evidence_id
  • do_not_mix_drawing_revisions
  • do_not_average_conflicting_values
  • prefer_explicit_labels_over_shape_only
  • match_plan_profile_and_cross_section_when_applicable

Provenance

Basis
taxonomy_spec
Project values included
no
mindmap_module_spec_taxonomy_highway
no page list

Children (0)

None — this is a leaf class and can be deleted.