Matched toExcavation Shoringbridge.construction_system.shoringon “Temporary Shoring”
| The class asks for | Unit | A reading with that name | From |
|---|---|---|---|
| LengthL | m/mm | 55'-0" | p1 · bridge_1_right |
| HeightH | m/mm | no reading by that name | |
| Surface AreaA_surface | m2 | no reading by that name | |
| Material TypeMAT | — | no reading by that name |
Paired on the measurement’s name only, which cannot know that three span lengths sum to the deck length. Step 3 works these out properly for every item it matches — reading every crop behind the item, deriving what the drawings imply and showing its arithmetic. This item has not had that pass yet; the button runs it for this one.
Every dimension read for it12
- 74'-7 15/16"Plan dimensionnot attributedp1 · bridge_1_right
- 1'-9 1/2"Minimum vertical clearancenot attributedp1 · bridge_1_right
- 40'-0"Gutter-to-gutter dimensionnot attributedp1 · bridge_1_right
- 43'-7"Gutter-out-to-out dimensionnot attributedp1 · bridge_1_right
- 6'-0"Plan dimensionnot attributedp1 · bridge_1_right
- 34'-0"Plan dimensionnot attributedp1 · bridge_1_right
- 22'-0"Plan dimensionnot attributedp1 · bridge_1_right
- 14'-1" MIN.Minimum dimensionnot attributedp1 · bridge_1_right
- 15'-0"Plan dimensionnot attributedp1 · bridge_1_right
- 55'-0"Span lengthnot attributedp1 · bridge_1_right
- 82'-0"Span lengthnot attributedp1 · bridge_1_right
- 55'-0"Span lengthnot attributedp1 · bridge_1_right
Notes on the sheets that carry it
- p11. ALL BENTS ARE PARALLEL TO ℄ CENTRAL OF GEORGIA RAILWAY COMPANY.
- p12. END BENT PILES NOT SHOWN.
- p1** 3. STATIONS ARE ALONG ℄ SR 21 AT INTERSECTI... AND B.F.P.R. OR ℄ BENT. ELEVATIONS ARE ALONG EASTBOUND AND WES... PROFILE GRADE LINES AT THE INTERSECTION OF ... PROFILE GRADE LINES AND B.F.P.R. OR CENTER...
- p1*** 4. MEASURED ALONG ℄ SR 21.
- p1* 5. LEFT BRIDGE: MINIMUM REQUIRED VERTICAL CLEARANCE = 23... EXISTING TRACK VERTICAL CLEARANCE CALCULA... FUTURE TRACK VERTICAL CLEARANCE CALCULA... RIGHT BRIDGE: MINIMUM REQUIRED VERTICAL CLEARANCE = 23... EXISTING TRACK VERTICAL CLEARANCE CALCUL... FUTURE TRACK VERTICAL CLEARANCE CALCULA...
- p1** 6. MINIMUM REQUIRED HORIZONTAL CLEARANCE = ...
- p1TEMPORARY SHORING AS NECESSARY, TYP.
- p1CHAIN LINK WIRE FENCE, TYP.
- p1TO BE REMOVED
Every crop it was read in — the drawing beside what the model took off it
Page 1
bridge_1_rightUnclear
- Temporary shoringAs necessary, TYP.
12'-1" MIN. Minimum dimension74'-7 15/16" Plan dimension75'-10 15/16" Plan dimensionN. 2°-23'-16.7" Plan dimension1'-9 1/2" Minimum vertical clearance40'-0" Gutter-to-gutter dimension43'-7" Gutter-out-to-out dimension6'-0" Plan dimension+32 more