Matched toApproach Embankmentbridge.approach_earthwork_system.embankmentcheckon “Endfill”
1 read off the drawings · 1 derived · 2 not established
| The class asks for | Value | How | From |
|---|---|---|---|
| LengthLwants m/mm | 21'-0" ft-in15'-0" + 4'-0" + 2'-0" = 21'-0".The detail shows the endfill control profile and three consecutive horizontal control dimensions. No single dimension is explicitly labelled as the endfill length; therefore the combined horizontal extent is attributed to the endfill detail. | derivedcheck | p1 · p01_r03 endfill control diagram |
| Cross-sectional AreaAwants m2/mm2 | not establishedThe detail provides horizontal controls, one 4'-9" vertical control, and a slope, but does not establish the complete bounded endfill cross-section needed to calculate an area. | not found | |
| Material TypeMAT | not establishedThe endfill object note explicitly states that material is not stated. | not found | |
| SlopeSLOPEwants ratio/percent | 1 vertical : 2 horizontal ratioThe slope measurement explicitly applies to the endfill slope. | read | p1 · p01_r03 endfill control diagram |
Worked out by openai/gpt-5.6-terra from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p1TOP OF HIGH RAIL, TYP.
- p1ENDFILL CONTROL POINT, TYP.
- p1* NORMAL TO RR ℄
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r03 endfill control diagramDetail
- endfill×1sloping and stepped fill profileProfile is shown below the top line; material is not stated.
15'-0" horizontal dimension4'-0" horizontal dimension2'-0" horizontal dimension4'-9" vertical dimension1 vertical : 2 horizontal slope