Matched toBridge Assetbridge.assetcheckon “Bridge/Structure”
1 derived · 1 not established
| The class asks for | Value | How | From |
|---|---|---|---|
| Total LengthL_totalwants m/mm | 80 mProposed Span given as '2X40m' meaning two spans of 40m each: 2 × 40m = 80m total structure length.The key plan table states 'Proposed Span 2X40m' for the bridge/structure, which directly gives two spans of 40m each; summing gives total length. No other length dimension (e.g., approach lengths) is given, so this is taken as the total structure length. | derivedcheck | p1 · p01_r01 site key plan showing row and road alignment |
| WidthWwants m/mm | not establishedThe key plan crop provides chainage, span, skew, and structure type but no carriageway or deck width dimension. No width value or components to derive it are present in the reading. | not found |
Worked out by anthropic/claude-sonnet-5 from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
Notes on the sheets that carry it
- p1PROPOSED CH: 64+412
- p1STRUCTURE TYPE MJBR
- p1PROPOSED SPAN 2X40m
- p1SKEW 30°
- p1PROPOSAL New Construction
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r01 site key plan showing row and road alignmentPlan
- Bridge/Structure (proposed)×1rectangular hatched zoneCross-hatched trapezoidal area over Shipra River indicating the proposed structure location per key plan table
64+412 Proposed CHMJBR Structure Type2X40m m Proposed Span30 degrees SkewNew Construction Proposal64+400 Chainage marker64+500 Chainage marker0.6 m Utility duct/pipe diameter+1 more