⚠ No class in the bridge ontology fits this itemAdd a class
Survey/legal boundary line, not part of permanent works; no matching class.
How the sheets named it
Road/Right-of-Way boundary linesROW
Notes on the sheets that carry it
- p1INDEPENDENT RETAINING WALL
- p1MEDIAN WALL PCC M15
- p1TO KHANDWA
- p1PROPOSAL: New Construction
- p1STRUCTURE TYPE: MJBR
- p1PROPOSED SPAN: 2X40m
- p1SKEW: 30°
- p1PROPOSED CH: 64+412
Every crop it was read in — the drawing beside what the model took off it
Page 1
crop
p01_r02Plan
- Road/Right-of-Way boundary linesROW×4linearMultiple ROW labels along the alignment in Key Plan
40000 Overall length (square)46189 Overall length (skew)30 degrees Skew angle3500 Bay spacing16550 Total width1275 Edge dimension5000 Typical spacing3750 Bay spacing+10 more
crop
p01_r01 site key plan showing row and road alignmentPlan
- Right of Way boundaryROW×4linearMultiple ROW lines/labels bounding the corridor on both sides
64+412 Proposed CHMJBR Structure Type2X40m m Proposed Span30 degrees SkewNew Construction Proposal64+400 Chainage marker64+500 Chainage marker0.6 m Utility duct/pipe diameter+1 more