Matched toCrossing Alignmentbridge.alignment_system.crossing_alignmentcheckon “River”
| The class asks for | Value | How | From |
|---|---|---|---|
| Skew AngleTHETAwants deg | 30 degDirectly stated as 'SKEW: 30°' in structure data table on Key Plan and repeated as '30° SKEW' label and 'Skew angle: 30 degrees' measurement on Half Plan crop; this skew applies to the structure crossing the river at this location.Both crops explicitly state the skew angle of the bridge structure crossing the Shipra/Kshipra River as 30 degrees. Since the river is the feature being crossed at this skew, this value is directly attributable to the river crossing item. | read | p1 · p01_r01 site key plan showing row and road alignmentp1 · p01_r02 half plan showing foundation level |
| ChainageCHwants m | 64+412 mDirectly read as 'Proposed CH: 64+412' in the structure data table, noted as the location where the structure crosses the Shipra River.The chainage 64+412 is stated as the proposed structure location, and the note explicitly says the bridge crosses the Shipra River at this chainage, so this chainage is attributable to the river crossing point. | read | p1 · p01_r01 site key plan showing row and road alignmentp1 · p01_r02 half plan showing foundation level |
Worked out by anthropic/claude-sonnet-5 from the readings below, which are the source. A derived value shows its arithmetic — check it against the drawing before it is priced.
How the sheets named it
Notes on the sheets that carry it
- p1PROPOSED CH: 64+412
- p1STRUCTURE TYPE MJBR
- p1PROPOSED SPAN 2X40m
- p1SKEW 30°
- p1PROPOSAL New Construction
- p1INDEPENDENT RETAINING WALL
- p1MEDIAN WALL PCC M15
- p1TO KHANDWA
- p1℄ OF EXP. JOINT
- p130° SKEW
- p1CH.: 64+412
Every crop it was read in — the drawing beside what the model took off it
Page 1
p01_r01 site key plan showing row and road alignmentPlan
- River (Shipra River)×1irregular natural watercourseLabeled 'Shipra River' crossing under proposed structure
64+412 Proposed CHMJBR Structure Type2X40m m Proposed Span30 degrees SkewNew Construction Proposal64+400 Chainage marker64+500 Chainage marker0.6 m Utility duct/pipe diameter+1 more
p01_r02 half plan showing foundation levelPlan
- River (Sipra River)×1natural watercourseShown crossing the alignment in key plan
40000 Overall length square46189 Overall length skew30 ° Skew angle1275 Span width dimension3500 Span width dimension16550 Total width1275 Edge dimension3750 Spacing dimension+9 more