Bridge No. 1 Lt and Rt
donebridge_1_rightSubstructureElevation
Unclear17 objects · 40 measurements · 9 notes · 24 labels
This crop contains a bridge general arrangement with a plan at the top and an elevation at the bottom, rather than a single elevation view. It documents left and right bridge bent positions, walls, deck bearing/joint locations, railroad and future-track clearances, bridge length and bent-station information. The right edge includes a partial proposed vertical profile and a bent-elevations table; some note text is cut off by the crop boundary.
Objects · 17
| Mark | Object | No. | Shape | Material | Note |
|---|---|---|---|---|---|
| WALL 1 | Wall | 2 | rectangular | Front face shown in plan and elevation. | |
| WALL 2 | Wall | 4 | rectangular | Front face shown in plan and elevation. | |
| BENT 1L / BENT 1R | Bent | 2 | B.F.P.R. end bent locations shown; end bent piles not shown. | ||
| BENT 2L / BENT 2R | Bent | 2 | Interior bent locations shown. | ||
| BENT 3L / BENT 3R | Bent | 2 | Interior bent locations shown. | ||
| BENT 4L / BENT 4R | Bent | 2 | B.F.P.R. end bent locations shown; end bent piles not shown. | ||
| Pile cap and piles | 2 | rectangular pile cap with vertical piles | Shown below Bents 2 and 3 in elevation. | ||
| Bridge deck | 1 | straight deck slab/profile | Shown in elevation with PGL. | ||
| EXP. | Expansion joint | 4 | Locations shown in elevation. | ||
| FIX | Fixed bearing | 2 | Locations shown in elevation. | ||
| Chain link wire fence | 3 | mesh panel | wire | Labeled TYP. | |
| ℄ EXISTING TRACK | Existing track | 1 | alignment | Shown below bridge in elevation and in plan. | |
| ℄ FUTURE TRACK | Future track | 1 | alignment | Shown below bridge in elevation and in plan. | |
| ℄ FUTURE ACCESS ROAD | Future access road | 1 | alignment | Shown in plan and elevation. | |
| Future groundline | 1 | irregular line | |||
| Approximate existing groundline | 1 | irregular line | |||
| Temporary shoring | As necessary, TYP. |
Measurements · 40
| Measurement | Value | Unit | Applies to |
|---|---|---|---|
| Minimum dimension | 12'-1" MIN. | ℄ CENTRAL OF GEORGIA RAILROAD COMPANY EXISTING TRACK | |
| Plan dimension | 74'-7 15/16" | ||
| Plan dimension | 75'-10 15/16" | ℄ FUTURE TRACK | |
| Plan dimension | N. 2°-23'-16.7" | AHEAD | |
| Minimum vertical clearance | 1'-9 1/2" | ||
| Gutter-to-gutter dimension | 40'-0" | ||
| Gutter-out-to-out dimension | 43'-7" | ||
| Plan dimension | 6'-0" | ||
| Plan dimension | 34'-0" | ||
| Angle | 81°-20'-05.0" | Bents | |
| Station | STA. 18+16.85 | ℄ SR 21 | |
| Station | STA. 303+80.83 | ℄ CENTRAL OF GEORGIA RAILROAD COMPANY | |
| Begin bridge station | STA. 17+23.00 | BEGIN BRIDGE | |
| Station | STA. 17+29.07 | RRMP D-0080.54 | |
| Station | STA. 19+08.93 | ℄ SR 21 | |
| End bridge station | STA. 19+15.00 | END BRIDGE | |
| Bearing | N. 83°-43'-21.7" E. | ℄ SR 21 | |
| Plan dimension | 22'-0" | ||
| Minimum dimension | 14'-1" MIN. | ||
| Plan dimension | 15'-0" | ||
| Plan dimension | 25'-8" | MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN | |
| Plan dimension | 36'-4" | MIN. HORIZ. CL. CALCULATED TO FACE OF COLUMN | |
| Total bridge length | 192'-0" | Bridge | |
| Span length | 55'-0" | ||
| Span length | 82'-0" | ||
| Span length | 55'-0" | ||
| Elevation | EL. 151.00 | Pile caps | |
| Station | 17+26.35 | LEFT BRIDGE BENT 1 | |
| Station | 17+81.35 | LEFT BRIDGE BENT 2 | |
| Station | 18+63.35 | LEFT BRIDGE BENT 3 | |
| Station | 19+18.35 | LEFT BRIDGE BENT 4 | |
| Station | 17+19.65 | RIGHT BRIDGE BENT 1 | |
| Station | 17+74.65 | RIGHT BRIDGE BENT 2 | |
| Station | 18+56.65 | RIGHT BRIDGE BENT 3 | |
| Station | 19+11.65 | RIGHT BRIDGE BENT 4 | |
| PVI station | PVI STA. 18+10.00 | SR 21 PGL profile fragment | |
| PVI elevation | EL. 197.80 | SR 21 PGL profile fragment | |
| Grade | +5.4180% | SR 21 PGL profile fragment | |
| Grade length | 560.0 FT. | FT. | SR 21 PGL profile fragment |
| Grade | +5.4443% | SR 21 PGL profile fragment |
Labels
PLANELEVATIONBENT ELEVATIONS **LOCATIONBENT NO.STATIONLEFT BRIDGERIGHT BRIDGEPGL WESTBOUNDPGL EASTBOUNDPGL℄ CENTRAL OF GEORGIA RAILROAD COMPANY EXISTING TRACK℄ FUTURE ACCESS ROAD℄ FUTURE TRACK℄ EXISTING TRACKTO PERKINSTO US 25/SR 121TO GA HIGHWAY 23BEGIN BRIDGEEND BRIDGEPOINT OF MIN. VERT. CLEARANCEFUTURE POINT OF MIN. VERT. CLEARANCEMIN. HORIZ. CL. CALCULATED TO FACE OF COLUMNNOTES:
Notes
- 1. ALL BENTS ARE PARALLEL TO ℄ CENTRAL OF GEORGIA RAILWAY COMPANY.
- 2. END BENT PILES NOT SHOWN.
- ** 3. STATIONS ARE ALONG ℄ SR 21 AT INTERSECTI... AND B.F.P.R. OR ℄ BENT. ELEVATIONS ARE ALONG EASTBOUND AND WES... PROFILE GRADE LINES AT THE INTERSECTION OF ... PROFILE GRADE LINES AND B.F.P.R. OR CENTER...
- *** 4. MEASURED ALONG ℄ SR 21.
- * 5. LEFT BRIDGE: MINIMUM REQUIRED VERTICAL CLEARANCE = 23... EXISTING TRACK VERTICAL CLEARANCE CALCULA... FUTURE TRACK VERTICAL CLEARANCE CALCULA... RIGHT BRIDGE: MINIMUM REQUIRED VERTICAL CLEARANCE = 23... EXISTING TRACK VERTICAL CLEARANCE CALCUL... FUTURE TRACK VERTICAL CLEARANCE CALCULA...
- ** 6. MINIMUM REQUIRED HORIZONTAL CLEARANCE = ...
- TEMPORARY SHORING AS NECESSARY, TYP.
- CHAIN LINK WIRE FENCE, TYP.
- TO BE REMOVED
openai/gpt-5.6-terra · 7920 tokens · 24.2s